Commercial Energy Compliance

We have been working with Caddick Construction Limited on two of their most recently completed developments. A new car showroom at Calver Park Road in Warrington for the Car People and four new industrial units at the site known as Sugarbrook Drive in Liverpool.

‘We enjoy working on a diverse range of projects and aim to provide a complete package of services to give our client confidence in achieving overall compliance for the development’ Laurie Wills (Director).

Element Sustainability carried out desk-based assessments of the proposed ‘building fabric’ and M&E systems to determine the initial design SBEM Calculations. Additionally, commercial air permeability testing has been carried out by our air testing engineer and the As Built Stage Part L BRUKL Reports and EPCs have been prepared.

Share This Post

More Blog Posts

Earth Day 2024

To celebrate Earth Day 2024 a number of volunteers from the Element Sustainability team spent some time litter picking in our local community. As the

Find Out More »

Changes to BREEAM Fees

As part of their annual review, the BRE have today announced that they will be increasing their registration, QA and certification fees by approximately 10%

Find Out More »

BREEAM v7 Overview

The update for New Construction, Refurbishment and Fit-Out and BREEAM In-Use schemes as a result of the upcoming BREEAM v7 assessment methodology will focus on

Find Out More »